Modify Jacket Drain Lines LD-1521 and LD-1545 to LD-LDB-1 at Tank 38 CX(s) Applied: B1.3Date: 02/12/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Exposure of Materials in High Temperature Molten Salt Systems for Corrosion and Electrochemical Studies CX(s) Applied: B3.6Date: 02/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Deteriorated Deck and Overhang at 740-1G CX(s) Applied: B1.23Date: 02/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Heavy Mineral Separation CX(s) Applied: B3.6Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New 773-A CHEX HEPA Filter Fluid Seal Housings CX(s) Applied: B2.3Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
M-Area Vadose Zone Well Abandonment CX(s) Applied: B3.1Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Add Blanks in CHEX Ductwork Between FLT-7 and FLT-8 and Remove Out-of-Service OGE Ducting CX(s) Applied: B2.3Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 719-5N CX(s) Applied: B1.3Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Well Abandonment CX(s) Applied: B3.1Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocate Buildings 183-5K and 183-6K to H-Area CX(s) Applied: B1.22Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office