Financial and Technical Assistance to the South Carolina Emergency Management Division CX(s) Applied: A9, A12, B1.2Date: 04/20/2016 Location(s): South CarolinaOffices(s): NNSA-Headquarters
Subcontractor to Repair SRS Railroad System CX(s) Applied: B1.3Date: 04/19/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Excavate/Repair Leak Outside on Domestic Water Line - 704-L CX(s) Applied: B1.3Date: 04/19/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Integrated Waste Treatment Unit (IWTU) Steam Reformer CX(s) Applied: B3.6Date: 04/19/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Radiological Evidence Examination Facility (REEF) Evidence Examinations CX(s) Applied: B3.6Date: 04/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Laboratory Kd Measurement of Non-contaminated Nanoparticles and RAD Spiked Solutions CX(s) Applied: B3.6Date: 04/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Algae Control in the 281-8F Retention Basin, ETP 241-97F Cooling Water Basin, and 241-103H Cooling Water Basin CX(s) Applied: B1.3Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Broken Asbestos-Containing Siding & Wall Panels in 105-C CX(s) Applied: B1.3Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace UPS System in Building 701-2L CX(s) Applied: B2.2Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Boral Specimen Examination and Testing CX(s) Applied: B3.6Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office