Replacement for SRNL Air Handling Unit CX(s) Applied: B1.3Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of SCO Sludge, Supernate, and Glass for Tank Farm Return CX(s) Applied: B3.6Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Nitrate Conversion of Reillex Resin in 786-A CX(s) Applied: B3.6Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Advanced Fuel Cycle Initiative (AFCI) Americium/Curium Separations CX(s) Applied: B3.6Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove of Diesel Fuel Storage Tank Located Adjacent to Access Gate 36 in E-Area CX(s) Applied: B6.1Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Perform Annual Flow Testing of Hydrants, Curb Boxes, and Fire Tank Systems in B-Area CX(s) Applied: B1.3Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace 26 Fence Posts in the Security Fence Around 703-5B CX(s) Applied: B1.3Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
L-Lake Dock Replacement CX(s) Applied: B1.3Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Perform Soil Sampling by the Underground H-Canyon Exhaust Tunnel CX(s) Applied: B3.1Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office