Microscopy and Spectroscopy Research and Development CX(s) Applied: B3.6Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Renovate Lab for Kinetic Phosphorescence Analysis (KPA) CX(s) Applied: B1.31Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Glass Formulation, Testing, and Characterization CX(s) Applied: B3.6Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocation of Cell Exhaust and Diversion Hand-Switches CX(s) Applied: B2.3Date: 06/02/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
C-Area Trailer Disconnect, Demolition, and Removal CX(s) Applied: B1.22, B1.23Date: 06/02/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Correct Leak West of Building 607-3F CX(s) Applied: B1.3Date: 06/01/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Enhanced Sorption of Metals on Humate Amended Soil CX(s) Applied: B3.6Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of Plutonium Oxide CX(s) Applied: B3.6Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 701-3H CX(s) Applied: B1.3Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Trench Drain and Maintenance Repairs at 773-52A CX(s) Applied: B1.3Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office