H-Area Trailer (249-10H) Removal from Savannah River Site CX(s) Applied: B1.23Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
N-Area Trailers and Handi-Houses Demolition and Removal CX(s) Applied: B1.23Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Nalco Chemistry Control System in 241-98H CX(s) Applied: B1.5Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-51E CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-55H CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New Heating, Ventilation, and Air Conditioning System for L-Area Disassembly CX(s) Applied: B2.1Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New Electric Gate and Controls at Building 645-1N CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Savannah River National Laboratory A-Area Trailers to be Removed From Service and Demolished CX(s) Applied: B1.22, B1.23Date: 08/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Vent Propane Tanks, Replace Relief Valves, and Replace Anodes to Correct Cathodic Protection on Underground Storage Tank's at 754-11A CX(s) Applied: B1.3, B2.5Date: 08/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office