Subcontractor Will Provide Roof Repairs at 782-1M CX(s) Applied: B1.3Date: 05/25/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Correct Underground Domestic Water Leak on West Side of 781-A CX(s) Applied: B1.3Date: 05/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 722-8A CX(s) Applied: B1.3Date: 05/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dynamic Pressurization CX(s) Applied: B3.6Date: 05/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dip Coating Apparatus CX(s) Applied: B3.6Date: 05/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Zn Trapping Efficiency Testing CX(s) Applied: B3.6Date: 05/23/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Ion Exchange of Simulated Dissolver Solutions CX(s) Applied: B3.6Date: 05/23/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hydrogen Effects on Mechanical Properties of Alloys CX(s) Applied: B3.6Date: 05/23/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Mechanical Properties of Tritium-Exposed Alloys CX(s) Applied: B3.6Date: 05/23/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Existing Cathodic Protection System for 703-6B Underground Storage Tank CX(s) Applied: B1.3Date: 05/19/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office