CX-018709: HB Line Entry Control Facility Sprinkler System Modification

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

June 19, 2018
minute read time

This Modification Traveler will generate a design to modify the existing sprinkler system in HB-Line Entrance Center Facility. The partitioned Lexan walls are obstructing the sprinkler system spray pattern coverage. The design will add two additional heads and move another to allow code compliance.