Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 19, 2018This work scope is to retrieve the Asbestos Containing Material from the roll-off pan outside of Building 722-1A. The building had an asbestos inspection performed and the report generated identified the floor tile with mastic as asbestos containing material.