221-H Section 3 Personnel Tunnel Concrete Core Drilling to Test/Analyze Concrete Cores and Install Sample Ports CX(s) Applied: B3.1Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of a 480-volt Electrical Line CX(s) Applied: B4.12Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocate Lathe to 234-7H CX(s) Applied: B1.31Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fiberglass Pipe Pressure Cycle Testing at 723-A CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Pressurization and Aging of Hydrogen Charged Zirconium Alloys using Argon CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Renovation of 773-A, Lab B-107 CX(s) Applied: B1.31Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Raman and Absorption Spectroscopy CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Savannah River National Laboratory Glass Shop Relocation & Operation at ACTL CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace and Relocate Uninterruptible Power Supply Y100 CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Gate Cycle Counters for 701-1K and 701-2K Vehicle Gates CX(s) Applied: B2.2Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office