Removal of spent blast material from the blast yard.…
ATTA Range 1 Berm slope repair.…
CM-3887/Install Welding Exhaust Fan in Building 711-N.…
Install Pedrick Pipe Bender in Building 711-N.…
Install Clausing Radial Drill Press in Building 711-9N.…
Installing a new Clausing Radial Drill at 711-N.…
This work will remove water from the vacuum line between Building 779-A and Sand Filter stack, ICAMS enclosure.…
Replace high-bay lights with LEDs and remove the roll-up door motor at 725-2N.…
This EEC will cover research and development efforts with a Raddec Pyrolyser.…
HRTL Lab 144 (HRTL High Bay) is utilized by the Hydrogen Isotopic Processing Section for the Hydrogen Processing Demonstration System (HPDS.)…