Electrochemical techniques are being adapted to monitor microbial physiology and growth in-situ and in real time.…
Nonradioactive and radioactive powders will be milled to evaluate the operating parameters and performance of a ball-milling process.…
Replace lights with LEDs at 711-6N.…
713-N Install new exit signs.…
Replace Lift Station Pump 003 at 607-86G.…
Replace No. 003 Cooling Water Return Pump/Motor located at 281-2H.…
The Classified TEF D/3 Control Systems are currently running D/3 version 12.2.3 on Windows Server 2003, for which Microsoft has discontinued suppo…
Replace flooring in M-15 lab and adjacent corridor due to radiological spill and contamination.…
Small pieces transite material have broken off of exterior surfaces around 105-L and near Steam Station No. 3 Outside Assembly Building.…
Work Orders 1850572, 1857145, and 1850940 were created to implement stormwater erosion and sedimentation control improvements within the Savannah R…