The Advanced Engineering department of the Savannnah River National Lab has an Additive Manufacturing lab.…
Activity will prep, paint, and seal roof flashing and wall on the South and East side of the E-004 Roof and sealing joints in wall panels, and roof…
This replacement will result in a reduction of maintenance needs for the UPS units.…
Painting in the interior and exterior of 701-2K.…
741-N Empty and sort 3 Rad C roll off pans.…
This proposed activity will provide the mechanical replacement of the HVAC unit, A-723015-HVAC-ACU-001, located on the west side of building 723-15…
Remove approximately 10 feet of insulation on caustic line to identify and repair caustic leak.…
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Remove insulation on caustic line to identify and repair caustic leak.…
This proposed activity is to remove two aging process air compressors located inside Section 18 of H Canyon and replace them with two new water-coo…