A new permanent dedicated lighting source (pole-mounted lights) should be installed at the L-Gate crosswalk.…
Install 2 UW drops in 722-A cubicles.…
As a part of an NA-22 funded research project, uranium oxide powders will be ball milled with trace impurities of metal, metal oxide, and salts at …
In order to evaluate and enhance Pu down-blend processing/efficiencies, solid powder-like materials testing and test location(s) will be installed …
780-2A Chemical tank removal and grout chemical dike.…
Replace light fixtures with LEDs at 711-N, 711-9N, 717-10N.…
Perform renovations in Building 735-A, Prep/Paint Walls, ceilings, cabinets, install new floor covering, cove base, apply floor finish to new floor…
Steam pipe 3/4 in.-LS-30-3 will be cut at the pipe support after valve LS-V-360.…
Add Inner Canister Closure Station (ICCS) flange heater platform and remove swing arm motor and gearbox.…
Installation of isolation valve for 782-2A.…