The Saltstone Dry Material Pre-Mix Screw Feeder is to be replaced due to it being obsolete.…
Attach approximately 1,056 square feet of 4’ X 8’ sound absorbing acoustical tiles on walls in Buildings 730-B (Rm 333), 730-2B (10'x20' room) and …
Replace 37 entrance doors at the B-Area trailer complex.…
Install 9 Universal Wiring (UW) drops in Building 772-F, Room 102.…
Replace and rewire all telecommunications/network circuits in 707-7F.…
Design and procurement for replacement Glovebox Oxygen Monitor System for HANM Secondary Stripper.…
Install new Universal Wiring in 705-H.…
This activity is to remove peeling, asbestos insulation on piping in 701-1H Room 14.…
The purpose of the design change is to replace the steel drain pipes with PVC where the steel lines exit the concrete of the building.…
Remove trees, underbrush, and all unwanted vegetation around the perimeter of K-Ash basin.…