Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
This EEC covers the installation of three Mobile Mini office trailers in H-Tank Farm (HTF).…
Temporary Modification to provide emergency exhaust for the Salt Solution Receipt Tank (SSRT) Process Vessel Vent (PVV) System to maintain National…
Activity 1 includes repairing a broken and eroded culvert and a storm drainage pipe located on the east side of building 211-44F. Activity 2 includ…
Disconnect and relocate double-wide trailer 245-9F from current location and install in E-Area on the site of former trailer 704-48E.…
Remove Trailer 704-29E to the SRS Community Reuse Organization (CRO) laydown yard in N-Area for future disposition.…
Preparations for the installation of two trailers in the former locations of 704-29E and 704-48E.…
Pull 5 Network Cables in 722-5A from Room 124 to Room 137.…
Install outdoor PA speakers per attached work instructions in 703-41A, 703-42A, 703-43A, 702-2A, 730-4B, 711-1N and 706-N.…
The Breathing Air System (BAS), except for the piping that runs to the manifolds, the final filter, and the manifolds in the various process rooms …