This EEC references an analytical method for density measurements using either a densitometer or an analytical balance.…
A-Block and B-Block shielded cells in 773-A are scheduled to house analytical methods involved with Laboratory Modification activities.…
Proposed activity (PA) is to remove old door and frame in 773-A, E-101 and replace it with a new 90-minute fire door and frame.…
Proposed activity (PA) is to repair broken stucco and seal wall at 773-A per Work Order (WO) 01921695.…
Remove existing ramp and replace with a similar ramp.…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
This activity includes the sampling and processing of water in cooling towers and heat injection systems at Savannah River Site for the presence of…
Aerosol DriSlide Multi-purpose Dry Lubricant will be applied to small metallic platens in a fume hood.…
703-A Install a board across broken window.…
Replace Tile Flooring, Sinks, Countertops, Toilets, General Refurbish 105-K plus 15 Men's Restroom.…