As part of the 288-F Ash Basin Landfill Reclamation Project, this activity will involve an annual relocation of approximately 3,800 cubic yards (2,…
Remove 282-H switchgear from service, air gap 13.8kV feeds, D and R 282-H structure.…
The operation of Tuttnauer Model 2840ELP Benchtop Autoclave for the steam sterilization of dry and liquid material in support of biological R and D…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
Replace MPC Crane High Pressure Sodium (HPS) Light with LED Lights.…
Identify the location of the caustic line leak at 211-H and perform necessary repairs.…
714-2N Replace carpet and paint.…
Fill two (2) MDB Doors for SRPPF with concrete and expandable foam at Central Shops.…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Design, fabricate, and place into service new disposable waste containers capable of being connected to a glovebox at the transfer container airloc…