Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…
Scope of this work order is to install a temporary cooling system for the fourth level control room at 221-8H fan house.…
This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV c…
Replace deteriorated gutter system on north side of 294-H Sand Filter to prevent the accumulation of rainwater on the sandfilter's roof per CDCF-H-…
Renovate the 249-H kitchen (249-H, Room 119B) with new cabinets, countertops, and backsplash.…
This modification will install Thermoelectric Coolers on seven (7) camera interface panels at 163-70K, CCO Pad.…
D and R "lean to" style outdoor storage shed (NBN, no building number) attached to the 105-L building near the Purification wing.…
Replace trash racks at 681-3G Pumphouse.…
901-Z EFP touch up painting.…
Fabricate glovebox window channel gaskets by cutting glovebox window channel gasket material and adhering mitered edges using Loctite 404. Install …