Install new cabinet and countertop at 784-7A.…
Removal of Rail in 400-D Area…
Paint building exterior at 251-F.…
Paint building exterior at 251-H.…
Subcontractor will provide roof repairs at 719-5N.…
Installing new door in 773-A, A-Wing.…
773-62A Sand and paint handrails on steps at trailers.…
This EEC covers general renovations and modifications to C and B Wing in 773-A.…
Bag filters will be installed to the make-up water feed (domestic water) of the K-Area Chilled Water System due to frequent clogging.…
Replace the current out-dated HVAC unit at building 717-10N with a new unit.…