To provide a safer accessible entrance route into building, activities will include the reconfiguring of two handicap parking spaces to make them s…
This EEC covers analytical methods for Radiochemical Measurements.…
Vendor to replace rail ties and perform maintenance on SRS railroad.…
Repair Chilled Water Pressure Control Systems at 703-44A.…
The 16A Ferrous Sulfamate (FS) Automatic Control Valve (HQ-13) is no longer able to be remotely operated and is impeding the addition of FS to Tank…
As part of the R-Area Groundwater monitoring network, the Core Team (DOE, DHEC
This deactivation includes electrical isolation of Building 235-F, which disables the installed lighting within the building (See EEC No. CBU-F-201…
The primary objective of this sampling activity is to collect sediment and surface water samples that provide confirmation data to support closure …
Remove and install flooring in Building 773-A, E-Wing, Room E-031.…
Ductwork will be repaired and insulation will be replaced as needed per WO 1832178.…