Replace MPC 13Ton Power Cable due to contamination.…
Subcontractor will provide roof repairs at 707-F.…
Because the Caustic Feed Tank Cold Sampler (S329-010-088-00-S) is no longer needed, all the sampler equipment can be removed.…
Disassemble and remove sections of nitrogen piping line NNG509 and install piping blinds.…
The activity is to install a new shower and vanity sink at 704-3N.…
Rev 6-Domestic water isolations to support D and D of 235-F will require a Site Clearance permit.…
Augusta Industrial will suck/pump slurry sediment from the 285-H basin cells and transfer to a de-watering box. The dry sediment will be transferre…
Perform grading around building 710-17N to help with storm water runoff.…
This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
The purpose of this EEC is to support the administrative action of processing a successor Land Lease Agreement for the SBA Landfill Cell Tower Site…