D and R SRNL Storage Water Tank/Fire Pump Wireless Monitoring System.…
Replacement of the CAEX Fan No 3.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
Remodel 784-7A Locker Room No 5.…
Subcontractor will provide roof repairs at 702-A.…
As part of the 288-F Ash Basin Landfill Reclamation Project, this activity will involve an annual relocation of approximately 3,800 cubic yards (2,…
Remove 282-H switchgear from service, air gap 13.8kV feeds, D and R 282-H structure.…
The operation of Tuttnauer Model 2840ELP Benchtop Autoclave for the steam sterilization of dry and liquid material in support of biological R and D…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
Replace MPC Crane High Pressure Sodium (HPS) Light with LED Lights.…