766-H Room 1029 Remove Carpet, Ceiling Tiles, and Wallpaper…
Remove the worn above ground drain pipe components of the GS level scupper drain pipe systems and replace them with similar new components.…
The subcontractor shall replace wooden line ties from the railroad bed, identified by site transportation and engineering as part of the 2022 scope…
Site Construction services to perform 703-41A building improvements.…
Vacuum pump oil change at 999-1W.…
Run copper cable from 719-5N to 704-199N.…
Air gap building propane system to Section C Lab Modules per M-DCF-A-01420 and WO 01891511.…
Fabricate and install crossover ramps on the roof of Building 221-F at expansion joints.…
Enhancements to be done in 704-K via removal of wallpaper from certain building hallways/corridors where needed, and applying paint, etc.…
Subcontractor will provide roof repairs to K-Area 918 Fan.…