The EEC evaluates the chemical cleaning process to remove the scale deposits from the 242-16H (2H) evaporator pot using nitric acid and in-pot neut…
Rev. 2. The sealant that was applied to the culvert adjacent to the paved area and the culvert across the fence at SRMC as described in Revision 1 …
This scope covers remediation activities at the H06 outfall.…
Perform habitability improvements at 710-14N per the attached SOW.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north sde of 713-1N.…
General Powder/Solid Material Combination Studies to evaluate various combinations of powder/solid material for fabrication into a durable form.…
Fabricate permeation tube and generate trace level dimethylmercury gas standards using the permeation tube and a Kintec calibration gas generator s…
Metallic alloys will be heat treated and/or oxidized in a controlled atmosphere as needed to support hydrogen research covered in separate EECs and…
Purpose of this EEC is to support the administrative action of processing a successor Land Lease Agreement for the SBA N-Area Cell Tower Site betwe…
The researcher will release headstarted gopher frogs at three sites and compare survival under different release and vegetative restoration methods…