Corrosion Tests on Carbon Steel Exposed to Simulants
Upgrade K-Reactor Building Plus 15 Level Lunch Room…
The atmosphere in crimp sealed cans that are stored inside of the Idaho National Laboratory (INL) 6M 30-gallon drums could reach the hydrogen Lower…
713-1N Paint Storage for Others (SFO) office area walls and install carpet in room N241…
713-1N Renovate kitchen and adjoining office area.…
This EEC references an analytical method for density measurements using either a densitometer or an analytical balance.…
A-Block and B-Block shielded cells in 773-A are scheduled to house analytical methods involved with Laboratory Modification activities.…
Proposed activity (PA) is to remove old door and frame in 773-A, E-101 and replace it with a new 90-minute fire door and frame.…
Proposed activity (PA) is to repair broken stucco and seal wall at 773-A per Work Order (WO) 01921695.…
Remove existing ramp and replace with a similar ramp.…