Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Monitor deformation continuously during Utah FORGE operations using both surface and downhole strainmeters, tiltmeters, and seismometers…
713-4N Replace door at Pipe Yard office.…
704-3N Correct walkway.…
Fabricate and replace the existing guardrails on the dock at 713-2N.…
766-H Install PA speakers.…
Remove/Replace the 3 Magnetrol level switches at 285-H Basin.…
Remodel of the kitchen area of building 709-1 G.…
Add crush and run to construct an access road to Gate 34 to help facilitate access to emergency vehicles during emergency response or drills.…
Renovate 784-7A restroom.…