Mitigate contamination migration on the RBOF Cask Pad.…
The Level Transmitter is being changed to a contactless radar.…
Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…
Four Handi-Houses located in the K-Protected Area (2) and Limited Area (2) are to be staged outside of K-Area and delivered to SRSCRO.…
This activity covers the tasks of receiving 7A or Croft SafDrums containing nuclear material from the K-Area Complex, unloading the shipping contai…
Graphite will be mixed with simulants of fission products and heavy metals.…
The gas chromatographs will be used to measure the composition of gases from laboratory experiments at 999-1W.…
This AC unit will be installed (DWPF-TMC-22-015) to provide supplemental cooling to the 210-S Office Conference and Lunchrooms.…
Install HAAS ST-20 CNC lathe in 723-A room 161 and provide compressed air service.…