This activity is for completing deactivation of the 236-H By-Product Facility.…
All activities pertain to the addition, removal or replacement of equipment located in Diffuser (DI) Glovebox T105-301-1, Cabinet 2, in Room 17 ofB…
In order to evaluate and enhance Pu down-blend processing/efficiencies, solid powder-like materials testing and test location(s) will be installed …
Install a Pressure Monitoring/ Relief Stations for legacy portable Z-Beds (aka Torpedoes) in the Tritium Facilities per M-DCF-H-13743.…
The existing water heater in Room 121 is being replaced with a similar model.…
Replace the existing Mercury Cabinet (HV-HOOD-2), Collection Tank (WEE-COL-1) and associated components and piping/tubing.…
703-23B Repaint Centerra dog kennels.…
Remove space saver and install 6 new modular cubes in 730-4B.…
Safety items in H area (outdoors) will be repainted due to fading due to sun exposure.…
Subcontractor to patch the asphalt that was damaged located directly outside the 980-S Loading Dock and 704-S.…