The Defense Waste Processing Facility (DWPF) wiring and pumps are to be upgraded in select locations.…
The Saltstone Bulk Material Handling (BMH) system is experiencing varying levels of deterioration to the metal thickness of the batch Weigh Hopper.…
Current Transmitters to be installed for Saltstone Mixer Alternating Current (A/C) current monitoring.…
The jockey pump controllers associated with the fire pumps will be replaced to maintain proper system function.…
Subcontractor will provide roof replacement at 151-1C.…
Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…
R and D and maintenance of radiation detection systems.…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the physical properties of tar sands contai…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the bioremediation of petroleum contaminate…