50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
Subcontractor to perform roof repairs on building 730-A.…
Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
Old technology is being replaced with new at outfall FM-1C.…
Refurbishing and repairing roof, windows, floors, and interior walls for 704-29E and 704-30E.…
Subcontractor will provide a roof replacement at 705-H.…
This activity is to replace the 151-1L DC breaker panel due to age and normal wear over time.…
Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
Install indoor PA speakers per attached work instructions in 703-B, 703-1B, 716-B, 772-7B, 772-25B, 772-27B, 789-B, 735-1B, 735-4B, 735-B, 703-5B, …