The new approach focuses primarily on monitoring systemic changes in groundwater flow and chemistry that could potentially remobilize attenuated co…
SRNL is planning to implement a new paradigm for long-term monitoring that would promote proactive decision making and reduce life-cycle costs comp…
Small (less than 5 mL) amounts of inert oil will be exposed to D2 gas and then exposed to gamma irradiation.…
773-52A Install bottle filling station.…
Subcontractor will provide roof repairs at 735-B and 735-2B. The existing roof is not to be disturbed while performing these repairs on 735-B and 7…
Perform habitability improvements at 710-14N per the attached SOW. This includes painting, new flooring and upgrade all lighting to LED.…
Renovate women's restroom in Building 751-1A.…
Relocate thermostat for HVAC and install new ceiling register in Restroom Trailer 704-40G.…
Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
This project involves the replacement of Barricade 9 which will be performed by the US Army Corps of Engineers (USACE).…