This evaluation covers operation of miniature mixer-settlers and centrifugal contactors used for solvent extraction in 773-A laboratories C-102, C-…
This revision includes the addition of Lab 142 and recirculating nitrogen cooling.…
Non-radioactive laboratory testing using simulants to study evaporative separation and solution oxidation of trace regulated organic chemicals usin…
In support of the E-Area Performance Assessment regarding corrosion rates of B25 boxes, SRNL will perform corrosion studies per ASTM G1-03 using st…
M-Area Recovery Wells (RWMs) 9 and 11 will be isolated from the M-1 Air Stripper recovery well network.…
In Building 731-1N, install carpet over tile and replace cove base.…
Subcontractor will provide roof repairs at 760-11G.…
Repair and seal the south wall of 713-3N.…
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system and new gutter liner.…
This activity will upgrades the electrical system at the 901-H Segregation Cooling Water Valve Pit.…