Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 167.…
Install (Gardner Denver L22 30HP 460V Cooled 125PSI with AEON90000SP oil and moisture trap rotary screw compressor) in building 717-F Construction …
722-4A Remove asbestos insulation/mastic on the 2 roof drain pipes.…
The project will prepare a Phase I Environmental Site Assessment (ESA) in accordance with applicable EPA regulations and ASTM standards to evaluate…
The Bundle Storage (MTR) Rack is Safety Signifigant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exisi…
Perform interior and exterior renovations to Trailer 704-10F.…
Paint exterior of 241-125H and install 4 new downspouts.…
This work is for a structural integrity inspection performed every 10 years.…
Additional FEDNET Communications Data Drops will be installed in 717-K.…
Replace carpet in Building 705-N, Rooms 3, 4, and 6.…