This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with an equivalent system that is more re…
We will live-trap raccoons and opossums at (30) study sites across SRS to study the factors affecting rabies elimination.…
The objective of this project is to evaluate the ecology of wildlife-vehicle interactions with respect to human perception, animal perception and b…
Funding will support the project team's small-scale research and development of a casting technology capabable of producing high-value metal compon…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
NNSA will be using the SEM 0202 (Serial No. 71-1216) shredder that they borrowed from Centerra at 713-N.…
703-43A Replace carpet and paint.…
ATTA-Demo existing canopy and erect a new canopy.…
Repair and replace asphalt at beween Buildings 713-N and 716-N.…