The APSX CNC Spyder machine will be used as a motion table to simulate the powder coating process for laser powder bed fusion - an additive manufac…
SRNL will perform hydrogen isotope separation R and D activities and test related separation equipment.…
Site construction will regrade the ditch along side building 713-3N to prevent water intrusion…
Jackson Boundary monitoring well JAX 1 will be abandoned in-place by grouting to surface. …
The U. S. Department of Energy, U. S. Environmental Protection Agency, and South Carolina Department of Health and Environmental Control agreed tha…
Southern Sector airlift recirculation wells SSR-002 to SSR-012 to be placed out-of-commission and abandoned in place.…
The A-2 Air Stripper has completed its cleanup mission. The South Carolina Department of Health and Environmental Control has agreed that the unit …
617-G Replace floor tiles.…
Isolation of the Confinement Heat Removal (CHR) System from the disassembly basin in K-Area. Revision 1 only to extend activity end date.…
This modification will install a security barrier at Building 105-K air handling unit's duct penetration point.…