Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with the SRS asbestos group. Sampling locations will be patc…
Installation and Operation of LM-1 Degausser and DX-8 Destruction device for fast destruction of hard drives in Building 226-F. …
Renovations to High Bay Rooms in Training Support Building 766-H and Installation and Maintenance of equipment for use by SRPPF Training.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
The Tritium facility has requested that the Security Inspections Operations Area (SIOA) and examination room in 701-3H be converted into an office …
Replace degrading temporary structures at 226-F Truck Unloading Dock area with engineered drainage system and piping that will reroute rainwater to…
Replace Nitrogen Pressure Safety Valves (PSV's) per preventive maintenance work packages.…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Sanitary Waste Treatment Facility-Re-coat Concrete Surface in the UV Channel and Cascade System.…