SRNL will study the mechanisms of iodine attenuation by using two commercially available organoclays PM-199 and MRM.…
A simulant of dissolved Fast Critical Assembly (FCA) H-Canyon solution will be prepared and neutralized with sodium hydroxide. Characterization of …
Alloys, glasses, and ceramics will be fabricated by melting together individual components.…
Release of P-10 gas from compressed gas cylinders in the event that a cylinder is over-pressurized for use on certain system manifolds.…
Install a new 3-Ton HVAC unit to provide conditioned air to the Water Jet Area to prevent costly maintenance to the Water Jet computer.…
Provide fire sprinkler suppression and fire alarm (exhaust duct) smoke detection in Facility 234-7H…
Relocation of the duct detector BE-14 in room 102 to the upstream of the same duct in room 122 will allow access to the duct detector without the u…
Replace the Modicon Quantum PLC with an Emerson DeltaV Safety Instrumented System with Electronic Marshalling.…
To continue to meet the surveillance mission while developing new systems, the installation of the vibration machine in 248-H is imperative and sho…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …