713-N Repair Leak and Baseboard Molding in Room 7.…
Window removal/replacement where needed and removal of small water heater, hand sink and associated supply and drain piping from 711-1N.…
Paint areas at 705-3C.…
Proposed activity installs Oxygen Monitor Model AMII 221R, D-0231 in Lab D-0231 of 773-A.…
702-A Exterior Wall Repair.…
Replace carpet in 708-1B room 132, Centerra.…
Subcontractor will provide a roof replacement at 731-2N.…
Rinse, seal and paint exterior walls on buildings as listed in the detailed descripition.…
Scope-Replace Pump Motors, Wiring, and Pipe Nipple at 715-3N…
Proposed activity is Work Order 1814974, 73E Repair-Replace Door Frame for E-055 Entrance, which will repair or replace the door and door frame bet…