714-5N, Facility Renovation, which includes civil and electrical repairs and renovations.…
Uranium is analyzed using kinetic phosphorescence in the UV range in 773-A, B-103.…
Extend the H Tank Farm Tank 29 purge exhaust stack to 50 feet above the tank top.…
Temporary rectifier is to be replaced with a permanent smaller rectifier for the S-Area Diesel Fuel Oil Underground Storage Tank and Underground Pi…
Remove current fire alarm equipment and install new equipment in its place.…
780-2A Chemical tank removal and grout chemical dike.…
736-A Room 104,107, and 108 Remodel.…
Replace soda ash piping and pumps at 607-59G.…
The scope of the activity includes the chipping and removal of material approximately 1.5 ft x 4 ft to expose the area in front of the recycle sump…
The installation of IAEA surveillance systems and electrical power in the Criticality Control Overpacks (CCO) Pad Storage Facility, 163-70K, to all…