Prep and paint 105-K Outer Assembly Area Walls.…
773-A, B135-139 is a multi-purpose laboratory equipped with instrumentation to process and-or analyze liquid, solid, and gaseous samples utilizing …
Dismantle and Remove (D and R) all equipment comprising the Low Level Waste Handling Station…
Plutonium trichloride will be synthesized by reflux heating plutonium(III) oxalate.…
Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing.…
The 292-S Diesel Fuel Oil (DFO) Underground Storage Tanks (UST) No 1 will undergo draining, cleaning and inspection. During inspection, determinati…
Remove the various oils from equipment inside 284-H as part of facility layup.…
Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible. Samplers are re…
The Decon Frit Slurry Recirculation Pump experiences premature diaphragm failures. Review of the manufacturer 's literature identified operational …
Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…