Isolation and removal of HAAS VF 5XT Lathe (DOE 011810) from Building 226-2F to Building 711-1N for storage until lathe is needed in the 717-F mach…
Evaluate/correct a brine solution leak at V-2261 in the chill water line for the office air handling unit at HB-Line soft structure.…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
Isolate the hazardous energy in southern portion of 735-A, C-Wing.…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility.…
This activity involves the removal of piping associated with the abandoned surge tanks along the River Water Pumphouse Distribution System.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs will be cleaned and resealed. This is a routine …
Install Copper Cable and Fiber Optic Cable to 727-5N.…
Remove a section of the ductwork, metal duct tray and supports in 711-N IronWorkers Shop.…
Perform pinch welding activities on stainless steel, titanium alloys and aluminum alloys. The pinch weld process is a solid state welding process t…