The objective of this study is to better understand the mechanisms of strontium sorption in aquifer sediments.…
Clearing of forested area near 703-B running track.…
Engineering Standard 15888 requires the change of HEPA/pre-filters. Maintenance will perform the seven year PM to change HEPA and prefilters.…
There is a sodium nitrite "jelly-like" blockage in the heel of the Sodium Nitrite Feed Tank located on the third level of 221-S. The blockage is pr…
709-1G Install power drop.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
Caustic dissolution of alum-inum metal is to be studied to support fuel target processing.…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Design and Procure a new and more reliable TCON Process Chillers for Building 233-H. The existing two TCON process chillers shall be Dismantled and…
Design and Procurement of Replacement Glovebox Oxygen Monitoring Alarm Panel in the Central Control Room of Building 233-H.…