Replace Battery Charger for Fire Annunciator Panel Located in Control RoomCX(s) Applied: B1.3Date: 01/13/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
221-H Warm Gang Valve Corridor Section 9 Air Conditioner Replacement UnitCX(s) Applied: B2.1Date: 01/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Operation of Zeiss Sigma VP Scanning Electron Microscope (SEM)CX(s) Applied: B3.6Date: 01/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Spectroscopic Measurement of IsoparL in Supernate and Dilute Nitric AcidCX(s) Applied: B3.6Date: 01/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Chloride Determination by TitrationCX(s) Applied: B3.6Date: 01/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Upgrades to BREs (Ballistic Resistant Enclosures)CX(s) Applied: B2.1Date: 01/06/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Wooden Pole Inspection/TreatmentCX(s) Applied: B1.3Date: 01/06/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Asbestos Involved Work in K-Area Complex FacilitiesCX(s) Applied: B1.16Date: 01/05/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
A Permeable Active Amendment Concrete (PAAC) for Contaminant Remediation and Erosion ControlCX(s) Applied: B3.6Date: 01/05/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Dissolution, Valence Adjustment, and Precipitation of ActinidesCX(s) Applied: B3.6Date: 01/03/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office