The reason for the change is due to the existing 3/4" blowdown being used to release water from the cooling tower basin being undersized for its in…
Pressure Wash and Paint Domestic Water Wellhouses at 905-155G, 905-115G, 905-158G, 905-111G, 905-126G, and 905-108G.…
A new receptacle will be installed at 704-16G in support of a dishwasher.…
Fabricate and install a new sprinkler pipe stand at 315-M.…
704-1N Installation of 5 RFID (Radio Frequency Identification) portals in the PCA (Personal Computer Administration) warehouse.…
Startrite Clausing Band Saw located in the Boilermaker's shop 717-1N, will be disconnected and excessed to the SRSCRO.…
731-1N Repairs in Restroom/Janitorial closet.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer and Ultivo triple quadrupole mass spectrometer in buildng 735-A,…
This EEC references an analytical method for density measurements using either a densitometer or an analytical balance.…
The filtration rate at the Salt Waste Processing Facility (SWPF) has been significantly less than the design target. Savannah River Mission Complet…