Metallography examination of contaminated samples will be performed. Contaminated materials requiring metallurgical evaluation will be cut, if nece…
Install Two New Doublewide Trailers in B-Area.…
Replace the electrically failed DESC station 15-1 (151-1C) 115/13.8 kV transformer with a new unit. DESC, responsible for O and M of the transforme…
This EEC covers the upgrades required to ensure the N-area "Paint Barn" 725-2N meets or exceeds NFPA Class 1 Division 2 requirements within the int…
731-4N Correct toilet in women's restroom.…
Install new shelf guard rails in building 713-N.…
Relocate and Demolish N-Area Trailers.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
Fan 929 Subsystem Improvements, K-Area: Changes to air flow, controls and the heating system.…
Parking Lot 613-1K and Quonset Building 663-K Paving…