Repaint 105-L Process Room Floor by light scraping, cleaning, scraping and mixing/applying paint coatings.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
Construction to install a new ice machine/water dispenser at 704-4N…
Install Water Intrusion Prevention Aids at the K-Area CCO Pad to prevent inleakage. The acronym CCO is Criticality Control Overpack (drums).…
Perform Roof Replacement of Administrative Building 705-K.…
A thermogravimetric analyzer (TGA) combined with a mass spectrometer (MS) are used for characterization of samples containing nuclear materials…
R and D and maintenance of radiation detection systems.…
This task is to identify alternative cleaning agents to Vertrel MCA and Vertrel XF. This task will selectively soil stainless steel coupons and cle…
This EEC covers special methods for the Radchem Group's postdoc projects, LDRD, nonroutine chemicals, etc.…