This EEC covers analytical methods for Radiochemical Measurements.…
This EEC covers various general renovations for Building 701-1A. Scope includes D and R such as replacing cabinets, flooring/cove base replacement,…
Renovation length of old high-pressure propane pipe in 773-2A cylinder shed and 773-A glass shop (D-0101).…
Radiological glovebox (OGE-GB-C1352) in Lab C-135/139 will be modified to allow fiber optic and cable connections to new R
Quarterly diesel fuel analyses will be performed in 999-1W, 129 for the Savannah River Remediation (SRR). Analyses include flashpoint, viscosity, w…
This EEC covers the implementation via P-DCP-H-18001 for the relocation of part of the 234-H Finishing Line process to 233-H. Functions and capabil…
This work scope at 704-30G trailer is to replace the North door. The completion of this work scope will include the working with Asbestos Containin…
The 2-inch Readco Mixer will be operated in EDL combining premix material with salt solution in order to create a grout waste form.…
This R and D activity will investigate the effects of various processing conditions on the synthesis of catalyst materials. Isotope exchange effici…
This EEC is for the operation of a Tabletop SEM to investigate dry solids through imaging and elemental analysis.…