Categorical Exclusion Determinations: Savannah River Operations Office

719-H Heating, Ventilation, and Air Conditioning Upgrade Project CX(s) Applied: B1.15, B2.1Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Design for Installation of New Power and Energy High Pressure Diffuser Assembly Stages in Tritium Facilities CX(s) Applied: B1.31Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation, Operation, and Removal of Nonproliferation Technologies Section Sampling Systems for Measurement of 291-H Stack Effluent CX(s) Applied: B3.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair and Replace Concrete Apron and Concrete Channels at H-Area Hazardous Waste Management Facility CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office