The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…
Fabricate and Install Replacement Trash Racks at 681-3G River Pump House.…
Renovation of the men's (Room E-62) and women's (E-61) restrooms in the Centerra-SRS Training Building 703-1B.…
The SRNL Analytical Development uses laboratory module 139 for development of sensors to detect and support hydrogen research. Opportunities to exp…
The Analytical Development group uses Agilent 5900 Inductively Coupled Plasma Emission Spectrometers (ICPES) to perform elemental analysis on both …
The existing control panel at Building 323-M needs to be updated.…
With the developing construction of the Surplus Plutonium Disposition (SPD) Project, two fabric tension structures (Quonset hut), enclosure fencing…
DCF to remove steam valve HPS-06M (H1-802000-EXPS-V-411) and cut and cap steam line with welded pipe cap.…
Assess possible interfering agents impacting groundwater treatment in M-Area in support of permitting/remediation objectives. The planned work cove…
Characterization of groundwater samples collected from SRS M-Area in support of permitting/remediation will be analyzed for a number of compounds i…