The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
The EEC covers the renovations to the interior of building 711-9N.…
Remove/Replace Air Handling Unit in the K-Area Purification Area.…
Replace Bar Screen Conveyor at CSWTF.…
Replace CSWTF Grit Concentrator.…
Operation of the ICP-MS in room 138 of building 999-2W…
As part of the DOE HQ Technology Development program, SRNL is partnering with PNNL to produce and test simulated waste glasses.…
This activity relates to the operation of a shielded Avance NEO 500 Nuclear magnetic resonance (NMR) system. This system reads residual magnetism f…
Subcontractor will perform a roof replacement on 735-B. The Subcontractor will disturb the existing roof on 735-B.…
This EEC covers the repair of ceilings in rooms 1, 2, 10, 10A, 9 and 9A in 711-1N.…