Install Temporary Boiler at 784-7A.…
Subcontractor 00000611 will perform roof repairs on 246-H. The Subcontractor will not disturb the existing roof on 246-H.…
SRTE will vent 1 cylinder of 2 percent O2 and Balance Argon (Cylinder
SRTE will vent cylinder containing 50 percent Helium and 50 percent Carbon Dioxide (Cylinder
The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
The DynaCool Physical property measurement system (PPMS) employs a minimum amount of condensed liquid Helium-4 for cooling both the sample chamber …
999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
Upgrade men's and women's locker rooms in 704-K. Revision 1 is specific to the replacement of existing vinyl sheet flooring and extending work dura…
Replace Lift Station Pumps at 607-44H.…