The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
The hydrogen system will be purged to replace valves.…
R and D for the development of uranium chalcogenides crystal growth with rad samples. The crystals grown in this lab will be using chemical vapor t…
This EEC covers general renovations and modifications to C and B Wing in 773-A.…
This EEC covers analytical methods for Radiochemical Measurements.…
Evaluate and Correct Process Well 905-108H.…
Solutions and salts of Al, Ce, Cr, Fe, Li, Ni, Mo, Ti, and/or W, and other potential transition metals, will be produced and used in the generation…
Savannah River National Lab will perform experiments for the development of uranium chalcogenide and transition metal chalcogenide crystal grow wit…
The Mini-Arc-Melter (MAM-1) will process intermetallic materials (non-rad samples). Operational activities include melting and alloying of small qu…